Showing posts with label gift knitting. Show all posts
Showing posts with label gift knitting. Show all posts

Monday, December 17, 2007

Christmas Knitting, complete

(FYI, this is written by Kate, not Shan as it says at the bottom. Shan was kind enough to take the photos and upload them for me. Thanks Shan!)

Well, having looked at my list I would say I have done well.
I have completed:
  • wrap and two pairs of socks for my mum
  • sweater for my dad (see pictures of it on me below - we are the same size)
  • mittens for my step-mom
  • head wrap for my sister-in-law
  • pair of socks for friend
  • scarf for father-in-law
  • wash clothes
  • miscellaneous gifts not to be mentioned before the knit group's Christmas party :)

Of course, most of these items are already being wrapped without being photographed, but at this time of year I just don't remember everything I should. (For instance, today I forgot to check on the hot lunch volunteers. As one of the coordinators today was my day to do that. I forgot. No volunteer showed up. Teachers handed out the pizza. Oops.)

So now it is a week before Christmas. The one big project still on my needles is my sister-in-law's sweater. I do have the back finished and a good start on the front, but this might wait for her birthday in February, as I don't feel the urge to speed knit it. Or I might just give it to her in the New Year. We'll see where we get with it.

I do want to make some hats for a friend's family as well.



front of the cycling aran. I see the zip is crooked on me, but you can see the lovely fit and the stand up collar here. I hand sewed the zip in. Also note the lovely cables up each side, although in heathered charcoal they are hard to photograph!

the 3 by 2 ribbed back. Perfect for a snug fit while cycling in our west coast wet winters!

Finally, At Last, Not a Moment Too Soon

I am done Print o' the Wave. Hopefully it will arrive in time for Christmas, but I don't really care if it doesn't. I'm just happy to be finished.


Print o' the Wave
Pattern: free download by Eunny Jang
Yarn: 1.5 skeins Island Hues (by Sweatermaker) 100% merino handpainted laceweight, 800 metres per 100 grams. Two different dyelots but they work together.
Yarn Source: Fun Knits, Quadra Island. Thanks again, Shelley.
Yarn Cost: $35 for both skeins, of which I used less than 1.5. So about $25.
Needle: 3.5mm Clover Takumi bamboo circular, and 3.5mm Addi Turbo Lace
Cast On: August 12, 2007
Bound off: December 14, 2007
Finished Dimensions: 97" long, 27" wide after an aggressive blocking.

Saturday, December 15, 2007

Seriously Relieved.




Full project details can be found here. And I'm totally done my Christmas knitting! I have one more FO to post (once it's finished blocking) and I can relax and enjoy the season.
By the way chickies, once the stole is dry it'll be wrapped and mailed immediately....I won't be able to bring it to knit night next week! Maybe I'll do a victory lap to everyone's house just so you can see it, on my way to the post office.

Tuesday, November 13, 2007

The Road to Hell.

Kate posted a long time ago about putting up our Christmas lists - that is, the things we have to knit for Christmas. I meant to get around to it but didn't until today.

My problem this year is, NOTHING IS WORKING OUT. Here is what I had planned:

1- Aran sweater for FIL
2- Print o' the Wave lace stole for MIL
3- mittens for my sister (later SOCKS for my sister)
4- spiral scarves for all my nieces
5- wristers for my SIL
6- socks for my brother

and what has happened to all these fine intentions?

1- still working out, thank God.
2- ran out of yarn. Haven't heard yet whether Shelley has been able to find me more. And, in my last conversation with my mother-in-law, she said "I once had one of those shawl wrap things...I wore it a few times but it kept sliding off my sloping shoulders and it drove me crazy." Doesn't bode well.
3- my sister didn't like mittens. So I cast on Chuck's Cabled Socks, accidentally reversed the needle sizes, and ended up with a sock that has enormous ribbing and a cruelly tight ankle. Gave up.
4- Gwen saw the scarves while visiting, and, trying to let me down easy, didn't give me much hope that her daughter will wear it. Apparently if she has seen a similar thing on someone cool, we're golden. If not....well, I guess a wrinkled nose is all I can expect. The donation bin will get these.
5- wristers.....yeah, right. NEXT.
6- wool socks for my brother? who wears like a size 12 shoe and lives in North Carolina? Again I say Yeah Right.

I'm a bit cast down about it actually, but I have made my peace with the situation and am content to just knit the Aran. If THAT doesn't work out, then I will be truly distraught, and qualify as an utter failure.

It's that old story about whether people appreciate it. I've come to realize it doesn't bother the intended recipients not to receive the knitting I had planned for them - at least, not nearly as much as it bothers me not to give it. My people, as far as I can see, would rather have a DVD or a couple of books. It costs me, what...$20 for that?

So, we'll finish off the Aran sweater, and that'll be it. If I get the stole done, maybe it can be a Mothers' Day gift for my mother-in-law, along with a nice pin to keep it on her shoulders. Or, maybe I'll rent a table at a craft fair one of these days, and sell it for $200. And use that money to buy yarn to make something for.........myself.

Thursday, August 16, 2007

No Such Thing as "Too Early"

Christmas knitting has begun. I am planning to work 5 of these spiral scarves this year, with matching wristers, for the nieces.
I know it's a bit cheapy and not very nice yarn or anything, but the thing is they're children, and not too discerning as to fibre. I hope they'll like them, anyway, even if they're not fancy or expensive. The ruffled scarf and matching ruffled wristers (not made yet) will be cute together, sticking out of the girls' winter coats.

And here's the first progress shot of my MIL's print o' the wave stole:
I have to work a total of 34 of these repeats (I've done 6 in two days) then pick up for the edging. Should be interesting - first lace project. I had signed up for MS3 but didn't find a satisfactory yarn so abandoned the project after the swatch stage. This is better - I like how it looks finished and I wouldn't have wanted to take the chance on an unknown outcome for a Christmas present. This pattern is nice and easy to memorize too. I can't tell you how much I love the yarn - "Island Hues" by Judy McLean of Sweatermaker (a hand-spinner/dyer from Courtenay, I believe). Fun Knits and at Uptown Yarns both stock her yarn and fibre, though she doesn't have a website of her own.
So, we're off! Only four months left of knitting time!

Monday, July 16, 2007

What to do, what to do?

Oh crap oh crap, I am about to run out of yarn again. Any volunteers for one of the following?

a) helping me bash myself over the head with a mallet and end my suffering

b) knitting the second sock for me so I can sit in a corner weeping softly and eating my own hair

c) ripping back the sock to the cuff, taking out half a repeat, and THEN knitting the second sock for me, maybe while I go lie down in the street in the hopes that some kind Samaritan will run me over in their car so I don't have to obsess about socks anymore, which would also provide a handy excuse to my intended recipient about why she's not getting any socks from me this summer. Because I would be dead.

Girls, seriously. Help me out here. Anyone?


Anyone?